A showcase of Ruchti's successful drywall projects and more
A multi-phase, ground-up build with 20-foot ceilings, fire-rated assemblies, and a Level 5 finish at the clubhouse.
A high-ceiling skylight infill and ceiling restoration on the main floor — completed in 10 days while the church stayed open for Mass, funerals, and community events.
A restaurant, gift shop, working winery, and second-floor office build — with sheetrock-wrapped beams, food-grade FRP, fire-rated assemblies, and high-end finishes throughout.
A two-week remodel across the main floor and lower level — working around existing conditions and a tight schedule, finished to Level 5 for the high-visibility clinic environment.